Lab / Field

Site · water · survey

Irrigation precipitation, septic napkin, well specific capacity, storm rational method, roof runoff, and a planar traverse. Numbers you typed, assumptions printed.

Start a Mission from an invention pack so this work has a home.

Start a Mission

Not IPC/UPC, not a soil test, not an intensity atlas, not a licensed survey.

Emitter grid

12.5 mm/h · runtime 0.8 h for 10 mm