Lab // Plumbing

Plumbing bench

Draw the run on the plan: click-click for orthogonal pipe, place fittings, then read Hazen–Williams head on the Run tab. A sketch you can check — not a permit.

Hazen–Williams in SI, fitting L/D as teaching equivalents. Not IPC, not UPC, not a permit, not a licensed design. Confirm the pipe in your hand and the book that governs the job.

Smooth plastic, new. C falls if the ID films over.

Click twice (or keep clicking) to draw an orthogonal pipe. Length is taken from the sketch at 16 px = 1 m — edit the table if the real run is different. Place fittings on the same plan.