Lab // Typology

Theories, not a catalog

You draw. You claim an occupancy letter and a hypothesis. Theories run on that sheet. Example plans exist so a test has something to bite — they are not the product, and this is not AutoCAD.

Occupant-load factors and occupancy letters are IBC-shaped teaching values. They are not a determination. Fire, accessibility, and hazardous occupancy stay hypotheses until a protocol and a code official say otherwise.

WcoConect CAD lab · built with SuperGrok

Draw first

Blank sheet

Walls, rooms, stamps, command line. Then claim a letter and run theories. Building types are one slice of this bench — circuits, field, mechanical, citations, and the research desk are the rest.

Theories you can run on any sheet

Occupant load

Floor area ÷ teaching m²/person. You claim the letter.

Egress

Doors vs teaching occupant load. Not a leaf-width takeoff.

Daylight

Glass vs floor. Teaching 10%, not a climate file.

Travel

Straight-line room to door. Not a common-path calc.

Energy

Teaching EUI from the sheet. Not ASHRAE 90.1.

Lighting power

Watts vs floor. Teaching LPD, not an energy code.

Sprinkler

Heads vs teaching coverage. Not NFPA 13.

Access kit

Ramp, 32-inch door, accessible WC — marks, not ADA.

Fire / H

Fire-tagged wall and hoods. The bench will not call occupancy.

Envelope

Wall length × storey. Teaching UA, not a load calc.

Acoustic

STC napkin from wall tags. Not ASTM E90.

Cost / carbon

Teaching $ and kgCO2e from room letters. Not a bid.

Common path

Nearest and second door · hall min width. Teaching, not IBC 1014/1020.

Example prototypes — optional, not the product

These are teaching floor plans so a theory has rooms to measure. Open one only if you want a start. People still draw.

dwelling · R-3

Studio dwelling

One room plus bath. The house we already walk.

dwelling · R-3

Two-bed house

Living, two bedrooms, bath, kitchen. A-101 cousin.

industry · S-1

Shop / garage

One bay, man door, overhead door.

research · B

Research lab bay

Corridor, two bays, fume hood. Occupancy B unless the protocol says H.

agriculture · U

Research greenhouse

Long bay, glass walls, grow benches. Crop model is out of scope.

industry · S-1

Warehouse bay

Dock, racks, exit. High-piled storage is a hypothesis, not a calc.

care · B

Clinic / exam

Waiting, exam, bath. I-2 only if patients are incapable of self-preservation — unknown here.

agriculture · U

Barn / stall

Aisle and stalls. Animal welfare is a research question, not a stall count.

assembly · A-3

Pavilion / assembly

Open hall, columns, two exits. Occupant load gets large fast.

education · E

Classroom

Desks, teacher wall, two doors. Occupant load is dense.

industry · F-1

Maker workshop

Benches, tool wall, dust. F-1 vs F-2 is a materials question.

commerce · M

Market hall

Stalls, aisle, egress. Merchandise layout is a test, not a lease plan.

dwelling · R-3

Two-storey loft

L0 living / L1 sleeping. Stair is a teaching run, not a riser schedule.

research · B

Research campus

Two buildings on a teaching site. Occupancy is mixed; this letter is the lab, not the house.

research · H-3

Hazardous lab (H-3 hypothesis)

Fume hood, eyewash, emergency shower, hazmat cabinet. Occupancy is H-3 only if a protocol and an AHJ say so — this bench will not.

research · U

Site / plot

House pad, parking, hydrant, trees. Zoning and a survey stay out of this bench.

commerce · A-2

Commercial kitchen

Prep, range, hood, two exits. A-2 is a stand-in for assembly dining; the kitchen itself is often accessory B.

research · S-1

Data hall

Server rows, CRAC, panel. Occupancy S-1 vs B is a use question. Power density is a hypothesis.

assembly · A-3

Theater / hall

Seats, two exits, exit signs. Occupant load gets large. A-1 vs A-3 is a program question.

research · B

Three-storey tower

L0 lobby, L1 office, L2 office, stair + elevator. Height/area is a napkin, not Table 504.

education · E

School wing

Corridor, two classrooms, accessible WC. Occupant load is dense. E is a stand-in.

dwelling · R-1

Hotel / guest wing

Lobby, two guest rooms, stair, elevator. R-1 is transient lodging teaching, not a sprinkler determination.

care · I-2

Hospital ward

Nurse station, two wards, accessible WC, ramp. I-2 only if patients cannot self-preserve — this bench will not decide.

industry · S-2

Parking garage

Open parking, stalls, ramp, hydrant. S-2 is a stand-in. Exhaust and fire are hypotheses.

civic · A-3

Worship / nave

Nave, sanctuary, two exits, pews. Occupant load is dense. A-3 is a stand-in, not a determination of worship vs assembly.

civic · B

Fire station

Apparatus bay, bunk, office. Mixed B + S-2 hypothesis. Exhaust of the bay is out of this bench.

civic · A-3

Public library

Stacks, reading, desk. A-3 vs B is a program question. Stack load is not a live-load takeoff.

dwelling · R-2

Apartment / R-2

Two dwelling units, corridor, stair. R-2 is multifamily teaching, not a sprinkler determination.

commerce · A-2

Restaurant dining

Dining, kitchen, two exits. A-2 is assembly dining. The kitchen is often accessory B — this bench will not split it.

assembly · A-3

Gym / sports court

Court, bleachers, two exits. Occupant load of bleachers is a mark count, not a seating schedule.

care · B

Veterinary clinic

Wait, exam, kennel. B unless animals change the story. Isolation is a protocol, not a room stamp.

industry · F-1

Brewery / production

Tank hall and a tap. F-1 vs A-2 taproom is a mixed-use question this bench will not decide.

dwelling · R-3

Duplex / ADU pair

Two side-by-side dwellings, fire wall between. ADU vs duplex is a zoning question, not this sheet.

commerce · M

Retail shop

Sales floor, stock, storefront. Merchandise layout is a test, not a lease plan.

civic · A-3

Community center

Hall, kitchen, office. Mixed A-3 + accessory B. Kitchen hood is a mark, not IMC 507.

civic · A-3

Museum gallery

Lobby and a gallery. Occupant load of exhibits is a program question. Climate for collections is out of this bench.

assembly · A-3

Natatorium / pool

Basin, deck, changing. Pool occupancy vs deck occupancy is a split this bench will not make. Chlorine and HVAC are hypotheses.

civic · A-3

Courthouse / courtroom

Courtroom and clerk. A-3 vs B for the clerk is a program split. Security screening is not on this sheet.

education · I-4

Daycare

Two rooms and a nap. I-4 only if children are too young to self-preserve — this bench will not decide E vs I-4.

commerce · M

Mixed-use podium

L0 retail, L1 dwellings. Occupancy of the building is mixed; this letter is the shop, not the flats. Fire separation is a hypothesis.

dwelling · R-3

Townhouse row

Two attached dwellings, fire wall between. Townhouse vs duplex is a zoning question.

commerce · B

Bank / teller

Lobby, teller, vault. Occupancy B. The vault is a room, not a UL listing.

commerce · M

Pharmacy

Sales floor and a dispensary. Occupancy M. The RX counter is a mark, not a Board of Pharmacy layout.

dwelling · R-1

Motel / motor court

Office and two guest rooms, each with a door to grade. R-1 teaching. Not a hotel high-rise.

assembly · A-2

Cafe / coffee

Seating and a bar. Occupancy A-2 if they sit. A kiosk with no seats would be M — this bench will not decide.

commerce · B

Cowork / studio office

Open studio and a meeting room. Occupancy B. Hot desks are a program, not a lease.

industry · F-1

Bakery

Bake hall and a shop. F-1 for the oven room; the shop is M if they sell — this bench will not split it.

commerce · B

Salon / barber

Chairs and a wash. Occupancy B. Hair salon vs assembly is a seat-count question.

commerce · B

Laundromat

Wash alley and a fold. Occupancy B. Machines are stamps, not a utility load calc.

civic · B

Post office

Lobby and a workroom. Occupancy B. PO boxes are marks, not a USPS standard.

commerce · M

Fuel / convenience

Shop and a pump canopy. Occupancy M. Fueling is a site mark, not IFC Chapter 23.